A PHP Error was encountered

Severity: Notice

Message: Only variable references should be returned by reference

Filename: core/Common.php

Line Number: 257

Citra Wahana Sekar Buana | Switch box for fully automatic testing of three-phase power transformers - CP SB1
Citra Wahana Sekar Buana

Product

Switch box for fully automatic testing of three-phase power transformers - CP SB1

Specification
CPC 100 Brochure
Power Transformer Testing
Description

Simplified and safer testing

The CP SB1 is an accessory for the CPC 100 and simplifies measurement of three-phase power transformers.

The switchbox CP SB1 reduces wiring work at power transformers. Thereby, the time needed for testing can be reduced and, at the same time, safety can be significantly increased.

The transformer ratio and winding resistance are automatically measured in all three phases (in sequence) in all tap changer positions. The measurement results are recorded by the CPC 100 and can be analysed with the accompanying software package.

Key features

  • Time saving: Rewiring no longer necessary
  • Safety: one-time connection of cables
  • Minimization of measurement errors: Fully automated testing
  • For every tap changer position the transformer ratio and winding resistance can be measured

 

Solution For:

 
Power Transformer Testing & Monitoring
 

Related Products